top of page

SCR-48 BUILD GUIDE

01

 

Position Trailer and unhitch.

 

Disconnect all electric and air lines.
 

Move vehicle out of the way

Positioning 

Unhitch.jpg

02

Power up the generator by turning the key to on wait for lights to go out and press the hand button followed by green button 

make sure all RCB switches are on.

Generator should start after few seconds.

Generator

WhatsApp Image 2019-10-16 at 2.20.54 PM(

03

Walk around trailer there are 2 levers near each leg one controls in,out and up,down level trailer appropriately.

Yellow floor pads are located in a box at rear.

hydraulic legs

Leveling.jpg

04

When lifting screen make sure the screen is fully down when initial unfold and then lift above the legs then lower while unfolding in unison,

to do the last unfold make sure screen is fully on deck. (checking rear seating pads on rear of screen)

Lifting screen pt1

Screen.jpg

05

This is the bracket that needs to line up on the reverse of the screen.

​

please don't spin the screen 360° in one direction as you'll damage the cat5 cable.

Lifting screen pt2

WhatsApp Image 2019-10-16 at 2.20.53 PM(

06

In the box under trailer there is a big black box open the front to find a scaler (Kramer) DVD, amp, sender box, blackmagic converter.

a loom of cables compromised of HDMI cables, VGA cables, bnc, phono.

depending on what you need.

connecting inputs

KRAMER INFO.jpg

07

There is a wind meter fitted to the top of the screen and the readout display is located in the box,

just make the client aware of this, the wind ratings are on the sign off sheets.

Wind Meter

WhatsApp Image 2019-10-16 at 2.20_edited
bottom of page