GS130 BUILD GUIDE
01
Position Trailer and unhitch.
Disconnect all electric and brake away connections to tow vehicle.
Move vehicle out of the way
Positioning
02
Apply middle and rear leg first lifting trailer
once that completed spin dolly wheel and then attach front legs
Level grandstand accordingly
legs & Leveling
03
Remove bungees on sides
undo Clasp holding roof down on corner of roof section
using pokey pole push up roof so it clicks open twice.
pvc
04
Within small black boxes located in centre of trailer on each side there is a remote control connect at rear of trailer and there 3 Levers (R-T-S)
Roof,t, Sides.
S lever down and up button on remote.
Lowering sides
05
Once sides are lowered insert pins into holes to secure sides down.
3 pins per side
side pins
06
Lower middle set of seats just use hands lowering gently
Centre steats
07
Release Clasp that locks tilting sides down. Making sure the area is clear pull lever up on (T= tilt) and pressing the up button on the remote.
Side Clasps & tilt
08
unpin the legs and allow to fold down while holding the leg press up on the grandstand rocking gently to get leg into place pinning through holes at bottom.
working your way down.
Rear brace legs
09
Remove pins from front step lowering it to groud then use the pins on the two outer rear brace bars.
Front step
10
lower the rear legs placing a wooden pad under the foot attach the Leg spacing bar colour corresponding,
6 in total
Rear legs
11
after all rear legs are down and leg spacer bars are connected apply the scissor braces fastening in each corner either with bolts or r-Clips depending on stand.
pin the foot collar to level the leg spacing bar and continue down the trailer.
scissor brace
12
Remove all 4 pins securing roof down and at the controller / levers lift R= Roof up and press the up button on controller until you can see holes appear on the lifting rams (where removed pins originaly) then replace pins asap.
raising roof
13
long leg bar goes to the front ,attach with the triangle spike, slotting in the hole on the front corners then twist and attach to the bracket on the bottom, fastening the leg in with the pin and R-Clip
repeat on the opposite side.
roof legs
14
Rear legs attach after the back handrail is in place repeat the process fitting front legs.
repeat same process on opposite side.
rear legs
15
attaching handrails rectangular ones go across the rear seats in specific positions
the side ones are parallelogram shape and the smaller of the two go towards the rear and bigger one to the front
repeat on opposite side
fasten all handrails together with supplied straps.
hand rails
16
attaching the curtain has to be done by the rear of the stand firstly lay curtain out accross rear seats
make sure curtain goes around the rear leg on the outside and attatch to the clip. then attach to the checker plate the full length of the stand and around opposite rear leg. push remainder over handrail.
rear curtain
17
attaching curtain to rear legs with bungee cord already fastened to the curtain gets wrapped around the rear legs and hooked into the lowest point.
continue on every bungee wrapping the end ones around the stand