STAFF | GS150 | Event Equipment Hire
top of page

GS150 BUILD GUIDE

01

 

Position Trailer and unhitch.

 

Disconnect all electric and brake away connections to tow vehicle.
 

Move vehicle out of the way

Positioning 

WhatsApp Image 2019-04-29 at 1.15.17 PM.

02

Apply middle and rear leg first lifting trailer

once that completed spin dolly wheel and then attach front legs

Level grandstand accordingly

legs & Leveling

Spin dolly and attatch front legs.jpg

03

Remove bungees on sides

undo Clasp holding roof down on corner of roof section

using pokey pole push up roof so it clicks open twice.

pvc

Bungee & Roof.jpg

04

Within small black boxes located in centre of trailer on each side there is a remote control connect at rear of trailer and there 3 Levers (R-T-S)

Roof,t, Sides.

S lever down and up button on remote.

Lowering sides

sides gs-90.jpg

05

Once sides are lowered insert pins into holes to secure sides down.

3 pins per side

side pins

WhatsApp Image 2019-04-18 at 5.07.12 PM(

06

Lower middle set of seats just use hands lowering gently

Centre steats

WhatsApp Image 2019-04-18 at 5.07.15 PM(

07

Release Clasp that locks tilting sides down. Making sure the area is clear pull lever up on (T= tilt) and pressing the up button on the remote.

Side Clasps & tilt

Tilt Process.jpg

08

unpin the legs and allow to fold down while holding the leg press up on the grandstand rocking gently to get leg into place pinning through holes at bottom.

working your way down. 

Rear brace legs

WhatsApp Image 2019-04-18 at 5.07.17 PM.

09

Remove pins from front step lowering it to groud then use the pins on the two outer rear brace bars.

Front step

Front step.jpg

10

lower the rear legs placing a wooden pad under the foot attach the Leg spacing bar  colour corresponding, 

6 in total

Rear legs

rear legs.jpg

11

after all rear legs are down and leg spacer bars are connected apply the scissor braces fastening in each corner either with bolts or r-Clips depending on stand.

pin the foot collar to level the leg spacing bar and continue down the trailer.

scissor brace

Rear scissor brace and leg.jpg

12

Remove all 4 pins securing roof down and at the controller / levers lift R= Roof up and press the up button on controller until you can see holes appear on the lifting rams (where removed pins originaly) then replace pins asap.

raising roof

WhatsApp Image 2019-04-18 at 5.07.38 PM.

13

long leg bar goes to the front ,attach with the triangle spike, slotting in the hole on the front corners then twist and attach to the bracket on the bottom, fastening the leg in with the pin and R-Clip

repeat on the opposite side.

roof legs

roof front legs.jpg

14

Rear legs attach after the back handrail is in place repeat the process fitting front legs. 

repeat same process on opposite side.

rear legs

roof rear legs.jpg

15

attaching handrails rectangular ones go across the rear seats in specific positions 

the side ones are parallelogram shape and the smaller of the two go towards the rear and bigger one to the front 

repeat on opposite side

fasten all handrails together with supplied straps.

hand rails

hand rails.jpg

16

attaching the curtain has to be done by the rear of the stand firstly lay curtain out accross rear seats

make sure curtain goes around the rear leg on the outside and attatch to the clip. then attach to the checker plate the full length of the stand and around opposite rear leg. push remainder over handrail.

rear curtain

rear curtain.jpg

17

attaching curtain to rear legs with bungee cord already fastened to the curtain gets wrapped around the rear legs and hooked into the lowest point.

continue on every bungee wrapping the end ones around the stand

rear curtain pt2

WhatsApp Image 2019-04-18 at 5.07.46 PM(
Build Guide
Videos
Branding Info
bottom of page